Tuesday, May 17, 2016

ASPLS BULLETIN - ORIGINAL ALABAMA SURVEY

PREFACE

Others have suggested “the 73 manual” as inappropriate for use in Alabama since few of the section corners can be identified to a standard of “beyond a reasonable doubt”.  Recent published opinions have suggested this modification to our practice when closing a section or relying on a section corner. The following comments address this issue for your consideration. Also, we delve into the innate accuracy of the GLO surveys using modern methods and the actual field measurements.

And don’t think just because I wrote this article that I know everything about survey measurement, GPS, BLM manual or the original 1818 survey, or think I do.  In this article I am merely sharing what I know as an engineer-surveyor, my 43rd year.  Good surveying is most complicated and as the years go by I learn everyday and hopefully I can continue.  Now if you care to critique what is presented, please do so at jmh8743@bellsouth.net.  Remember, I am not a lawyer; therefore, as I have been told, I can only read the law, not interpret it.



CURRICULUM VITAE

A large portion of my early professional career was devoted to county government.  Those years, 1963 until 1980, formed much of the basis of my professional philosophy and ethics.  These character traits were set by the engineers and surveyors in that organization, one of the largest in the state, and of course my graduate level professors. My undergraduate and graduate studies enhanced my ability to successfully sit for civil service examinations.  Many of my competitors had the advantage of adding their “service years” to their score which made a top score difficult. My final position, as a division head, required politics, budgeting, preparation of examinations, design activities and response to one of the three commissioners.
1980 began my private practice and I formed a partnership with a prior county government employee. The company had at least 8 survey crews, at the time, as the development surge of the ‘70s began to wind down due to inflation that finally lead to 20% interest rates. This was not a good time to enter private practice.  My meager income was augmented by teaching surveying, a 4 course series, at UAB for Dr. Joe Appleton.  One of my first Company duties was to help our lawyer develop a defense for a surveying related lawsuit. The site was adjacent to Highway 79 south of  Tarrant, Alabama.  Upon review of the field notes, plat, my personal investigation and other discovery documents, I concluded we were wrong.  The crew used a non-verified monument for a “mortgage survey” and extended east, set half inch rebars.  Not good.

EXAMPLE ONE DETAILS

Months later, we received a copy of a resurvey of the Company survey prepared by a Birmingham surveyor. His survey disputed our work and in lieu of a mortgage survey, he performed an actual boundary survey with a 24"x36" format that made our 8.5"x11" appear childish. His point of commencement was a section corner, proceeded along the section line and finally to the lot corner. We were 12' too far east; except, the original plat was a recorded Jefferson County subdivision approximately 40 years old that Highway 79 had bisected.  He had crossed five streets to set the corner(s).  Few of his measurements were directed toward re-establishment of the block and the basis of his opinion was aliquot section data. The surveyor measured more than 4000 feet to set a partial lot corner.  I convinced my partner to hire Walter Robillard 1 as our expert witness.  Walter clearly disputed the survey premise  and procedure during court proceedings in spite of the inept questioning by our attorney. We lost. The judge awarded $12,000 to the plaintiff.  Four years later, the judge told me he was wrong.

THEN WHY ALIQUOT A SECTION?

A rogue case? The above was my first personal experience with the law and not the last. Prominent personalities and experienced practitioners at the time of our early surveying  studies, accepted texts that explain similar situations and periodicals dictate our background to a large degree.  Obviously, the prior situation was affected by simultaneous conveyance rules and any definition of the actual section offered deeper footsteps. I do not suggest this violates the need to close a section.
Secondly, were my instructors wrong?  Are the texts outdated?  Is the ‘73 manual of negligible value? More recent comments I have heard suggested closing a section is unnecessary and the ‘73 manual is inappropriate.  Other references describe a similar procedure. Let us address the latter first.
“The Manual” is still part of the land surveying examination.  It must be or so many aspirants would not be eager to “borrow” or “liberate” my copy.  We must, then, consider its value in our decision process.  I once stated “The Manual” specified preponderance of evidence for defense of a section corner. It does not; I was incorrect.  The criminal evaluation of  “beyond a reasonable doubt” has been stated by others as the evidence criterion. Does this warrant the entire publication invalid2?  Not in my opinion and not in the opinion of others.3
Continuing on the former topic and in my humble opinion, surveying is both theory and judgement. The mathematics aspect is much more complex now than in 1963 when all I had available was a rotary calculator and trigonometry tables (not the good old days). Electronic distance measurements, then total stations with data collectors (actually a desktop computer) and then Global Positioning have changed the complexity of the trigonometric computations.  A large portion of my land surveyors exam, one of the first 2 day exams, was related to plane trigonometry. Now spherical trigonometry is desirable.

The remainder is an understanding of the of the field procedures predominant at the time of the survey and interpretation by the courts. Division of a section is a necessity. We should realize “how important it is to occasionally, if not regularly, remind our younger peers of past developments affecting our profession”4.  Tape and transit surveys were so time constrained, the division of a section was not a viable alternative except by large entities5 until the EDM was available in the early 1970's, although very large and required a car battery.  My discussion submits an alternative to less experienced and/or interested surveyors concerning division of a section.  I offer the following for your consideration.

EXAMPLE TWO: RAINBOW CROSSING, BLOUNT COUNTY, ALABAMA


                       CHEROKEE BOUNDARY 1839

For example, Blount County has large areas that include the Cherokee Indian Boundary of 1819. The original government survey notes of 1819 show the survey terminating on the Indian Boundary. Then in 1839, the townships originally omitted were surveyed.  The ‘73 manual, for this situation and others, becomes a guide developed by more learned professionals to assist the practitioner with his decision making process.
Unusual circumstances were found. The north and south section distances are 4650 feet and my competitors set 1333 feet for a quarter section point from the west. The GS ran from east to west. The first vector to the “quarter section post” would have been 40 ch. in 1839. Beyond the Indian Boundary, the southwest corner was not reset or shown in the field notes in 1839. “The Manual” is not the only reference utilized. Any other source which can assist a determination is applicable, my entire library.
The U S government survey can be thought of as a simultaneous survey.  The sections of a township are the blocks of the survey and the each block is further subdivided into lots, 16 of them or 40 acre tracts. I apply generally the same rules to a section as I would a block of a simultaneous conveyance.  This is my own way of establishing rules, or guidelines, for my monument placement activities and from purely a practitioners point of view.  I’m sure some smart lawyer can find hundreds of court cases which dispute my procedure. We, as surveyors, require methodology that one of our contemporaries would think practicable, reasonable and retraceable.
The conditions I found a Rainbow Crossing were unique. The client owned, or would soon own, by inheritance, 270 aces more or less adjacent to the Cherokee Indian reservation and the original commissioned surveyor would not return6. The boundary was comprised of a fractional section and a standard 1819 section. This property had not been surveyed, since the original government survey. The fences found were “as a cow would wonder”.  Only the newer fences had any resemblance to linearity. The descriptions were simple 40 acre and 80 acre tracts based upon aliquot division of the section.





Shown is an aerial photograph with the sections lines portrayed. Reconnaissance time is reduced significantly and additionally, existing boundaries, contiguous and beyond are easily seen. The scale on the photo when downloaded was 1:10000.  Some you will find in urban areas that are 1:3000 or less.  1:10000 maps are frequently the standard.  The server did not specify whether the map was a rectified orthophoto or not.  Generally, features become the item used to locate a specific position, i.e. the Northwest section corner is located approximately 15' west of the lone oak tree which was apparent in the photo before I messed it up with the broad line.


SECTION 11 Blount County

The figure named “Blount County north of Rainbow Xing” is a portion of the final plat delivered to the client. Section 11 measures approximately 4650 north line, 5265 west line and 5305 east line. The south line has been further compromised by a survey which set the Southeast corner of the Southwest of the Southwest quarter 1333 feet east of the Southwest corner.  That corresponds to half the distance to the “rock” as shown by the official plat7 found along the Cherokee Indian Boundary Line8; whereas the rock was assumed to be the quarter section post. All of these issues had to be resolved before corners could be established in the north half of the section.


The “Original Survey, 1819"

THE PROPOSAL TO PROVIDE A BOUNDARY SURVEY

Presume for this discussion you are commissioned to set the Southwest corner of the North half of the Southeast quarter. Reconnaissance will result only in a meandering fence line.  From my experience in Cullman and the adjacent counties, you will find two procedures in practice.  The first would be 1) along the south line measure 1333' to the capped rebar, then another 1333' to the half mile, once again assumed as the rock, then turn North along the fence line and set a point at the end of the fence. Seven times out of 10, item 1) will be quoted over the phone as $1200 to $1800. The client is happy, the surveyor pays his crews and has a profit.




Then there is item 2): close the section, if required. Also assume, for this example, the ASPLS Board has, by resolution, declared “the manual” as inappropriate for use in Alabama since none of the section corners can be resolved to a standard of “beyond a reasonable doubt”.  As previously stated, published opinions have suggested this modification to our practice when closing a section or relying on a section corner; and, in the strictest sense, the “quarter section posts” as described by the field notes, would have to be located comparably.  How do you determine the 40 corners?


WHAT DOES THE MANUAL REALLY SAY?

Chapter V, Restoration of Lost or Obliterated Corners, describes the process a surveyor, and not necessarily  the BLM surveyor,9 utilizes:

5-1 The rules for identifying an approved official survey differ from those under which the survey was originally made. The purpose is not to “correct” the original survey by determining where a new or exact running of the line would locate a particular corner, but rather to determine where the corner was established in the beginning. The methods described here follow leading judicial opinions and approved surveying practice.10

Three monuments are described 1) an existing corner, 2) an obliterated corner and 3) the lost corner. An existent corner is one that is commensurate with the original monument or its accessories.  In other words, you must find the corner (i.e. the position thereof) based upon the references, parol evidence or the monument itself. Second, an

 “obliterated corner is one at whose point there are no remaining traces of the monument or its accessories, but whose location has been perpetuated, or the point for which may be recovered beyond a reasonable doubt by the acts and testimony of the interested landowners, competent surveyors, or other qualified local authorities, or witnesses or by some acceptable record evidence.”11

Lastly, the Manual defines the lost corner. “ A lost corner is a point of a survey whose position cannot be determined, beyond a reasonable doubt ...”. Now remember, a corner is the position and the monument is the object placed at the point or position. This situation prescribes “double and single proportionate measurements” to restore a lost corner. Only once or twice, in my checkered and dissipated career, have I digressed to this procedure.
INFORMATION ONLY
preponderance of the evidence
n. the greater weight of the evidence required in a civil (non-criminal) lawsuit for the trier of fact (jury or judge without a jury) to decide in favor of one side or the other. This preponderance is based on the more convincing evidence and its probable truth or accuracy, and not on the amount of evidence. Thus, one clearly knowledgeable witness may provide a preponderance of evidence over a dozen witnesses with hazy testimony, or a signed agreement with definite terms may outweigh opinions or speculation about what the parties intended. Preponderance of the evidence is required in a civil case and is contrasted with "beyond a reasonable doubt," which is the more severe test of evidence required to convict in a criminal trial. No matter what the definition stated in various legal opinions, the meaning is somewhat subjective.

beyond a reasonable doubt12
adj. part of jury instructions in all criminal trials, in which the jurors are told that they can only find the defendant guilty if they are convinced "beyond a reason- able doubt" of his or her guilt. Sometimes referred to as "to a moral certainty," the phrase is fraught with uncertainty as to meaning, but try: "you better be damned sure." By comparison it is meant to be a tougher standard than "preponderance of the evidence," used as a test to give judgment to a plaintiff in a civil (non-criminal) case.

reasonable doubt
n. not being sure of a criminal defendant's guilt to a moral certainty. Thus, a juror (or judge sitting without a jury) must be convinced of guilt of a crime (or the degree of crime, as murder instead of manslaughter) "beyond a reasonable doubt," and the jury will be told so by the judge in the jury instructions. However, it is a subjective test since each juror will have to decide if his/her doubt is reasonable. It is more difficult to convict under that test, than "preponderance of the evidence" to decide for the plaintiff (party bringing the suit) in a civil (non-criminal) trial.



Therefore as I stated in “WHY ALIQUOT A SECTION?” above maybe the criterion is in fact “a preponderance of evidence” to promulgate the position of a section corner and maybe this time I was not wrong. What do you think? Can we not, as professionals, ascertain the most applicable evidence appropriate for the conditions?

“The retracing surveyor should never have an attitude that since the survey is an ancient survey, there is no possibility of finding evidence.
In a GLO survey that was conducted in 1805 in Alabama, deputy surveyors established a section corner and marked four trees as witness trees.  One of the trees, a 6" yellow popular, was blazed and scribed. Applying all the rules of longevity, the tree should have a life span of approximately 150 years. Thus in a 1996 retracement, the surveyor would not have expected to find the tree still alive.  But in the 1996 retracement, a 60 in diameter yellow poplar was found with the proper blazing at the correct bearing and distance. Yet in the same township, no other trees from the original survey were found. One tree survived the odds”.13  This is fine and commendable, but how do we allocate the time for this research?



WERE THE ORIGINAL SURVEYS REALLY THAT BAD?


EXAMPLE THREE, ALONG THE HUNTSVILLE MERIDIAN

My practice has been fortunate enough to measure “existing monumentation” along the Huntsville Meridian.  Once again, the Rainbow Crossing project was in partial Sections 11 and 13, R1E, 5 miles distance.   The points shown below are positions along the Meridian in Twp10S, Sections 18 & 19.  The Manual defines the initial point of the Meridian as shown below.14  Quite useful is the fact that the variation in two miles is 7.32-5.77 = 1.55 (or 131 feet at this latitude) seconds based upon existing points, but I have to be careful using that term.
Thus the variation in longitude is a westward 51 seconds average. From the Initial Point Meridian of 86-34-16, the point for ROCK2 (See below 86-35-07.32) yields the Huntsville Meridian has translated 4313 feet west by latitude 34-09-07.17", assuming the Initial Point position15 could be reasonably approximated by the present GPS spheroid. The 1807 methodology was based upon Polaris.
Table -1-
RBR1        34-09-07.428168   86-35-38.769291    766.26  
RBR2        34-09-33.960539   86-35-44.185500    799.17  
RBR3        34-09-59.689160   86-35-06.246460    773.63  
RBR4        34-09-59.425579   86-35-06.291176    772.86  39.2' SOUTH OF HALF SEC 18
ROCK1       34-08-40.822340   86-35-07.712189    700.37  SW OF 19
ROCK2       34-09-07.171951   86-35-07.320484    714.33  HALF WEST LINE 19  
ROCK2@Mer   34-09-07.172000   86-34-16.000000    714.32  FOR CALCULATIONS


Continuing this line of thinking, how close was the latitude? Let’s take ROCK2 coordinates, found at the quarter section post on the West line of Section 19. This point is 9 townships and 3.5 miles south of the initial point, 57.5 miles.

S = rθ,   57.5 = 3963.3xθ; => θ = 57.5/3963.3 = 0.014508112 rad

θ = 0^49''52.51" subtracting this from the initial point yields

Lat = 34^09'34.49" North 1807
vs. Lat = 34^09'07.17" North measured 1983 spheroid.

Using 27.3", about 0.52 miles North  or 0.52/57.5 = 0.009 mi per mile Latitude

Utilizing USGS Holly Pond quadrangle plats and scaling techniques ROCK2 scales 34^09'08"North, 86^35'07" West.  Ok no bad blunder there.  The initial point scales from USGS quadrangle Fisk as 34^59'27" North and 86^34'16"W, OK.

ALONG THE WINSTON COUNTY LINE





(A) Assess the internal township measurements

Below I have compiled from the original 1818 survey the measurements made in Township 11, Range 6 West, the east boundary of which constitutes the Cullman County-Winston County boundary. Further, recent observations have determined the Northeast corner of Section 13 (on the East township line) as:
         
NE-13  34-05-40.689695     87-06-43.016408    764     Planted Rock W/X

The geodetic position was based upon simultaneous observations of CORS stations WMEL, EDFF AND DRUM  with dual frequency receivers and post processing.


Data from the original notes was reduced into the format required by a least squares adjustment tool the writer has been using for 10 years, STAR*PLUS PRO. The results of this numerical experiment is contained herein.

The data shown in the figure represents the distance shown to the “1/4 section post”, not the “half mile”, East to West and North to South. Interestingly, only five(5) random lines appear for the interior lines.  Normally, for this area, the south line of the section will be shown as 40+ 40 chains to the “1/4 section post” and the “half mile”. From that point the west section line will show a non-integer value indicating the west line was run and then trued.  Notice from the figure the closing distances on the south tier of sections. Remember the distances shown are
to the quarter section point.
Also from my experience, section lines that are close to 5280 feet have been adjusted by others later.  The adjacent mile will then be 5340'.  Consequently, all dimensions have been scaled by 5307/5280 = 1.057. The township boundaries are all listed as 80.0 chains by the original notes. One township line has to be random if I understand the procedure they used.  I submit to you, how could the township boundaries all be 80.0 chain miles?  As you can see the North-South lines of the south Tiers of lots are very long. The double lines shown represent the measured vs. the least squares adjusted.  The numbers to the side of the corner are point numbers used by STAR.
The adjustment results are as follows:

Parallel Latitudinal Lines Residual                 = 11.2 ft one standard deviation
              Average Residual                             = 15.5 ft

Meridional Lines
               One Standard deviation                  = 23.0 ft
               Average Residual                           = 22.7 ft
               Minimum Residual                          = -67.5 ft
               Maximum Residual                         = 110.7 ft

Earlier I mentioned the procedure utilized in 1807 and 1818.  The writer once possessed a original copy of James M Faircloth’s survey notes. The full text describes the instructions. At this time, the text is listed in my library card catalog, but, alas, missing or liberated.  Memory serves me no written record of the instructions to surveyors has survived until about 1830 which excludes Freeman and Coffee.  Next, my intention is to locate any data available concerning the prime meridian and the parallel.  The Manual indicates the meridian was initiated in 1807.

(B) Assess the Positional Location of NE corner of Section 13-Twp11S-R6W

ROCK 34-05-40.68970 87-06-43.016408 Observed position

The sphere in the upper right hand corner of the figure represents the Initial Point (IP) at the geodetic coordinates as originally determined and as shown above at the Huntsville Meridian.  Each one of the standard parallels represents a distance of 24 miles at the orthometric height.   The Third Standard  would be 3 X 24 =   72 miles south of the initial point. Then traversing West along this parallel TO the east line of Range 6 West would be 24 (i.e. 4 - 6 mile townships) miles + 6 miles = 30 miles.
Ascertain the “theoretical” longitude and latitude of the Southwest corner of Township 12 South, Range 5 West (i.e. along the standard parallel). Then North.

Latitude:

S = r2,   72 = 3963.3x2; => 2 = 72/3963.3 = 0.0181666793 rad
Where 3963.3 miles is the radius of the earth

2 = 1^02'27.15" then, subtracting this from the initial point yields

Lat = 33^56'59.85" North 1807 for the SW corner of Tp12S

From here,  we must traverse 10 miles along the guide meridian north to the NE  of 13
S = r2,   10 = 3963.3x2; => 2 = 10/3963.3 = 0.0025231499 rad
 = 0^08'40.44" deg
           33^56'59.85"
0^08'40.44"
34^05'40.29" Theoretical for 1818 sphere

34^05'40.69  Measured from the 1983 spheroid

Diff 0^ 00'00.40" too far North = 0.000001939 radians


S = r2,   S = 0.00000194X3963.3 = 0.008 miles North in latitude              (From the desired point)

Now the Longitude:     The position is 30 miles west of the Huntsville Meridian.

Remember on the meridian at Twp10S the meridian was 4313ft West. Assuming a linear relationship continues to the south line of Twp 12,  14.5 miles hence; therefore,

4313/5307 = 0.813 X 72/63.5 = 0.921 miles
       so for 30.921 miles add this to the IP Longitude.

 2 = 30.921/3287.66 = 0.009405318 rad
               2  = 0^32'20" further West along the Standard Parallel
(Standard Parallel radius at Northeast 13 =3287.66 miles)

Long of the IP 86^34'16"
0^32' 20.0"
87^06'36.0" Theoretical
              87^06'43.01" Measured from 1983 Spheroid

The difference =0^ 00'07.0" West as expected.
              = 0.0000340842 radians
   Thus S = r2 = 0.000034082X3963.3
                              = 0.135 miles
     
The Northeast corner of Section 13, Tp11S, R6W is substantially north and west of the theoretical point to be set by the GLO contracted surveyors as compared to our day.
     


CONCLUSION



(A) THE MANUAL ISSUE
The suggestion that all section corners in Alabama lack sufficient chain of custody and integrity and, thus, are invalid may be legally correct. Higher authorities in our legal system can establish this precedent. My humble opinion is the courts would not be so irresponsible. The practice of surveying in rural areas would change dramatically; whereas urban surveying would not be affected as much due to the abundant data available with recorded surveys and various legal jurisdictions “define” a section corner. The suggestion, purely from a practitioner’s view, is unconscionable.
History has shown, however, The Standards of Practice will not prescribe a procedure for the professional to follow, except required location of a minimum of 2 land corners, which is not being followed. Each practitioner then must “assume” or develop a means to fulfill his obligation.  The “new” standard would digress to Item 1) .  This does not cause a conflict until a survey is authorized and promulgated from a point north of the “end of the fence”.  Should our methodology become obsolete, a surveying “black hole” will originate; and additionally any prior monumentation will present conflicts.
My concern is related to consistency and repeatability. Presently, those groups that utilize item 1), fence surveys will continue to do so, regardless of ASPLS, the State Board or any standard legislated (without some aggressive review board). The establishment of interior “lot corners”, i.e. 40 acre tracts, in rural areas must continue in the manner of normal present practice.  The color of the capped rebar, when found, is an indication (to me personally) whether the survey meets Item I or Item 2 (from previous experience) standards of care. My effort is dictated accordingly.
Finally, should we abandon our current practice, some authority must prescribe a substitute methodology. Interestingly, BLM’s website information indicates The Manual is in the final process of being rewritten. The writer found a section by section recommendation of the expected revision material. The document is expected this year and BLM’s Director is to present the new edition material to the Kansas Surveyors Association early in 2007. Mr Dahl has stated the revised Instructions to Surveyors  is a high priority with BLM.

My procedure, prior to promulgating the procedures required for a “lost corner”, is to assume the corner is an obliterated corner. Research is then initiated adjacent to the corner for any deed that references the corner, especially those with specific calls. Judgement is used to ascertain a reasonable distance from the corner.  I begin my search at the coordinates given by the USGS quadrangle map.  Then investigate north-south and east-west depending on whether the obliterated corner is along a township or range line or not. This always results in determination of whether a point exists at the “quarter section post”.  The oldest evidence is given a higher weight during my determination. The most useful tool during reconnaissance is a recent aerial photograph and then my Magellan eXplorist.  Scaled points are to approximately 100 feet; whereas, computed points can be assumed to be within 15 feet.  Accuracy enhancement is enabled by computing the exact coordinate; then compute the fractional part correction to be made north and south from that integer value of the “seconds”.  First, find the point in the field that represents the integer value; then pace the correction off in the field.


(B) ALL GLO SURVEYS EXHIBITED SUBSTANDARD ACCURACY

On March 30, 1807, Gallatin instructed Seth Pease, the new Surveyor of the Lands South of Tennessee, to begin the rectangular surveys in the Chickasaw Cession, in what is now Alabama. The baseline was to be the 35th Parallel, the south boundary of Tennessee. The initial point on the state boundary was at the vertex of a triangular shaped tract in the Cession. The records indicate that this point was established by Deputy Surveyor Thomas Freeman in late 1807. Freeman ran the Huntsville Meridian south.

The above approach to assess the accuracy of an original GLO survey, from the authors experience, has not been seen in any periodicals or books. Often I have heard the GLO surveyors were “blowing, going and letting the rough end drag”. Maybe they were, but as today, not all of them. Once again, in my opinion, you cannot ignore the original notes.  First, I constructed the spherical geometry with Microstation XM Edition in conjunction with a Quattro Pro spreadsheet as a self check.  I may have all the errors found and corrected.
This brief discussion does show the unusual precision with a township on the Winston County line.  The internal measurements of the section had amazingly low residuals and did not resemble the time honored assumption of little confidence. Will all townships have similar tendencies due to the rectangular system? I don’t know.  Furthermore, the actual position of the township is close to the intended location (if all my computations are correct). At the time of the aforementioned survey of Section 13, I found a corner near the Southeast corner of Section 13 I believe to be the original. Others have conspicuously ignored the other rock and its witness trees. Further investigation is warranted with this and several other matters mentioned above.

FINALLY:

Regardless of what you are told, as a surveyor you do not have any official or judicial capacity.

Although title attorneys and others who regularly work with them develop expertise as to land descriptions, the only professional authorized to locate land lines on the ground is the registered land surveyor. In fact, the definition of a legally sufficient real property description is one that can be located on the ground by a surveyor. However, in the absence of statute, a surveyor is not an official and has no authority to establish boundaries; like an attorney speaking on a legal question, he can only state or express his professional opinion as to surveying questions. In working with the client, a surveyor can, in the first instance, layout or establish boundary lines within an original division of a tract of land which has therefore existed as one unit or parcel. In performing this function, he is known as the “original surveyor” and his survey results in a property description used by the owner to transfer title to the property that survey has a certain special authority in that the monuments set by the original surveyor on the ground control over discrepancies within the total parcel description, and more importantly, control over all subsequent surveys attempting to locate the same line. Second, a surveyor can be retained to locate on the ground a boundary line which has theretofore been established. When he does this, he “traces the footsteps” of the “original surveyor” in locating existing boundaries. Correctly stated, this is a “retracement survey”, not a “resurvey”, and in performing this function, the second and each succeeding surveyor is a “following” or “tracing” surveyor and his sole duty, function and power is to locate on the ground the boundaries corners and boundary line or lines established by the original survey; he cannot establish a new corner or new line terminal point, nor may he correct any errors of the original surveyor. He must only track the footsteps of the original surveyor. The following surveyor, rather than being the creator of the boundary line, is only the discoverer and is only that when he correctly locates it.
1) Robillard, Walter G, BSF, MAPA, RLS, LLM, FSMS; Atlanta, Ga.
2)  Since, in the strictest sense using the latter definition, every section corner I have described does not have the proper credentials, except maybe four? Further, all of those along the Bankhead Forest Boundary at the Cullman -Winston County line are also invalid I would presume.  This subject will be further discussed.
3) Wilson, Ian, Point of Beginning, The Great Sage Stone Expedition, page 14, Sept 2004.
4) Greulich, Gunther, PE, PLS, Point of Beginning, page 6, Point of View, September, 2006.
5) The ones I know personally of are limited to 1) government boundaries and 2) entities such as Tennessee Coal & Iron.  TCI  held large portions of Alabama and prepared plats of their holdings.  Copies I have seen dated back to the 1940's. Individuals now with these have an excellent source of data.
6) Should have taken hint
7) http://www.glorecords.blm.gov/SurveySearch/Default.asp
8) no longer valid
9) Lucas, Jeff, Traversing the Law, Point of Beginning, Pg 56, October, 2006
10)  The 1973 Manual, Pg 129
11) ibid pg 130
12)  http://dictionary.law.com/
13) Brown, Wilson & Robillard, Evidence and Procedures for Boundary Location, pg 105, Fifth Edition, Wiley


1) ibid pg 61
2) 1807
3) Many of the monuments I have set are rejected by the ground overnight and they too become missing. An interesting phenomenon.
4) See Example Two
5) Recently I received a copy of a survey that commenced at the intersection of two roads near Holly Pond, then traversed on an assumed bearing east for 560 feet dated 2001.  Impossible to retrace.
6) Robert W. (Bob) Dahl
Department of the Interior
Bureau of Land Management
Minerals, Realty & Resource Protection Directorate
Lands & Realty Group (WO-350)
Cadastral Survey
US Mail: 1849 C Street NW, LS 1000
Washington, D.C. 20240
FEDEX, UPS & Street Address: 1620 L Street NW, LS 1000
Washington, D.C. 20036
robert_w_dahl@blm.gov
(202) 452-5132
Fax: (202) 452-7708


Thursday, April 28, 2016

FARMERS LUNG - WALKING DEAD MAN

Beware  Farmer’s Lung

September 5, 2006

INTRODUCTION                                                        

We as surveyors and engineers are naturally attracted to the outdoors. There are many surveying hazards that are known to us and we accordingly avoid the associated risks; yellow jackets, poison oak, pine straw on rocky slopes, sharpening bush axes, etc. I was recently subjected to a severe experience that can be fatal or only discomforting, depending upon the individual and the precise circumstances. Hopefully my experience can prove a benefit to others.
My experience was very close to the former and proved life changing. “Farmer’s Lung” is a respiratory disease normally associated with long erm exposure to hay storage, logistics and feeding livestock. Small amounts of spores enter the lungs over a long term and systematic basis resulting in cumulative damage to the blood vessels and the attached air sacs in the lungs. As time progresses the individual has reduced immunity to pneumonia and upper respiratory infections. This can continue many years with only reduced physical complications. Predominantly, the damage results from the particulate matter inhaled from dry hay and the mold spores resulting from hay mold, or hay that has been subjected to water or rainfall.

A DIRECT EXPERIENCE

I do not own livestock. The horses I feed are 350 CI Chevrolet race engines. The Friday before
Memorial Day I began staking a roadway alignment for a two lot subdivision on the Cullman~Winston County line
     1. I cut 150' of line and set control on Friday.
     2 Tuesday after Memorial Day
I returned with my alignment computed in my Allegro, a 20' branch pruning tool and ready to
complete the centerline. I finished the curve to Smith Lake about 3:30 PM and loaded my gear
and returned to Cullman, about a 30 minute drive. Once I got unloaded, I felt my first symptom,
a feeling of dehydration (although it was hot that day I had consumed the liquids that are
normally required for me to function). My wife, Sue, had left work and came directly home ‘though often she stops and buys groceries on the way home.
The second symptom was a gurgling in my throat and the third intense pain in the center of my chest, all within 30 minutes. Paramedics transported me to Cullman Regional Hospital within 50 minutes of the third attack. The contact with the hay mold spores had occurred three weeks prior. Emergency and lung specialists treated me with antibiotics for two days with no affect and on the third day Intervention identified mold spores in my lungs.

1)
four(4) miles southwest of Crane Hill Post Office and on the west side of Smith Lake, a
remote site. 34-01-21"n, 87-06-42"w
2)
My practice, a single practitioner, is nearly identical to the one described by Milton
Denny in his recent article in POB.

THE DIAGNOSIS

The next three days I was unconscious. Tuesday night the ER physician told Sue I would not survive the night; however, ER nurses managed to keep me breathing. On Wednesday night the prognosis was the same and, unknown to me, the entire family was there in the waiting room to comfort Sue. All of this time, the treatment consisted of many antibiotics, for lime disease, legionnaire’s disease, et. al. My brother-in-law, Jim Holiday(3), was idly noting that a neighbor of his had suddenly taken ill just like I had; and before his family had gotten him to the ER he died. An autopsy was performed and revealed molded hay was the source of his unfortunate circumstance. Just by chance around 5:30 PM, Sue heard the word hay and remembered seeing 3 large round bales go by our house at Remlap and toward my brother’s new house. She called my brother who had just left the hospital via cell phone and found that I had participated in the distribution of those bales for erosion control purposes with my nephew. John and his grandson used our Kabota D-19 to carry the bales to the site and were above the work area. Sue got this word to Dr. Werner, a lung specialist, and Thursday a scope was inserted by Dr. Werner directly into my lungs and confirmed presence of ruptured blood vessels. Treatment then shifted to antibiotics and steroids. Dr. Werner had only seen two other cases like mine and neither had been close enough to the ER to receive treatment. So needless to say only by the grace of God am I sitting here writing this article.
The next 75 days (of which five weeks I was on a ventilator, two weeks in Cullman and three
weeks at St Vincent’s in Birmingham) are tedious to describe and I will not attempt to do so
except to say as of this writing I have been home for 16 days. Rehabilitation will continue until
January 2007. This situation is the extreme.

PRECAUTIONS

Individuals can react differently to hay mold spores ; with 30% developing an allergic reaction. The severity is that only 1 in 3 transported to a hospital after an attack arrive alive. Many times physicians diagnose the individual with pneumonia since xrays of the lungs are identical and subsequently treat the individual with antibiotics. Farmer’s Lung or hay mold allergic reactions are not affected by antibiotics and the patient will not respond. The proper treatment consists of steroids and if untreated death will result. Regional hospitals, here and Birmingham, are now more aware of “Farmer’s Lung” and since I left Birmingham, at least one young man has benefitted from my experience. Do not allow
yourself to breath dust originating from hay which has been subjected to rainfall. Also, the spores are very small. The average Lowe’s respiratory mask is insufficient. Avoid being downwind of landscaping activities of all kinds and any type of hydroseeding. You have a 30% chance of having an allergic reaction.

3  Jim is a descendent of the infamous gunfighter, “Doc” Holiday.




Sunday, April 17, 2016

ASPHALT RACING PARTS AVAILABLE

                                                                               
NEW-OLD STOCK $150
















                                                   

NEW-OLD STOCK $150
                   
                               



31X19X2.5" $200









Hurst 4 spd shifter
if interested more pic $75





C&R 31X17X2"  $50






                   

              DUMMY CHEV SETUP BLOCK






























Friday, April 15, 2016

MORE DETAIL ON THE #23 LATE MODEL CHASSIS

RIGHT SIDE1

LEFT SIDE











                   









               
     

C&R RADIATOR AVAILABLE


























Tuesday, September 22, 2015

LATE MODEL ASPHALT PROVEN CHASSIS FOR SALE $1500

S O L D 8-27-16

This is my late model at Old Birmingham. The #23 turned 20.0 sec at this track driven by Gary Nix which was very competitive at the time. At an ARCA race around the pole went to Freddie Query at 20.23. Gary Nix did not drive for me. The chassis is for sale or entire late model. See below. The last time this chassis was at speed was at the Snowball in 2006. In 2006 I nearly succumbed to "farmers lung" and after years of recovery I am unable maintain a meaningful operation. It has been stored since.



Gary Nix originally built this chassis, a big spring unit, which in my opinion is easier to setup as compared to coil over version. The front clip is a Howe 1994 and I have  the Howe setup manual and proper spring assortment for 1/4 and 1/2 mile tracks which goes with the sale. contact jmh8743 AT bellsouth DOT net





INCLUDED in the chassis sale:
  • 3 LF lower control arms, one modified to control bump steer.
  • 1 rf lower control arm
  • various upper control arms
  • instrument cluster and internal sheet metal
  • rack steering
  • adjustable, bearing mounted torsion bar
  • various shocks although I recommend you acquire adjustable 
  • full tube chassis
  • clutch and brake hanger(s) firewall mounted.
  • dual brake and single clutch reservoirs
  • sequenced brake pressure adjustment.
  • Howe chev headers
SALE - SALE - $7500 gets car and enclosed trailer


This rig would make an excellent "starter" package for a beginning late model racer OR a good backup for an experienced racer. The chassis was set up for 2800 lbs with 56% left side. IF you would desire parts or all of the race car I would consider serious. However, I was in the process of reassembly at the time of my illness and the buyer would have opportunity to fab the chassis in any form desired.
see:  http://winchester52.blogspot.com/2016/04/more-detail-on-23-late-model-chassis.html
and:
http://winchester52.blogspot.com/2016/04/asphalt-racing-parts-available.html;
Also See: http://winchester52.blogspot.com/2016/04/farmers-lung-walking-dead-man.html.

You want the entire car? 15 wide 5s, body panels, shocks, springs, 420 HP engine with 350 CFM,headers, bring me $7500. The links above only show a part of what I accumulated. Consider $10,000 of extras. You are paying 10c on the dollar.

This is one month and 5 days after hip replacement on Aug 31, 2015. Shoulder surgery then Jan. 7, 2016. Expect full recovery, as much as possible by March 2017. This is an excellent buy on this equipment and when I started racing I wished I could have found this deal. I have 22 wide five wheels for this chassis and a nearly complete body. Well worth your time if you are truly interested in LLM racing.

LEFT FRONT ADJUSTABLE

Tuesday, August 18, 2015

My Victor High Standard Mod 107 Military

BE pistols has always been an enjoyment however my scores were never good. During the 80s I was pistol VP for a prominent club in Birmingham and did sponsor regional matches AND got to meet Bill Blankenship. Of course he won and gave all 50 shooters a presentation. A highlight for me. one thing he did etch into my mind: don't practice with junk. He recommended this pistol.
My old eyes can not focus on front sight. Thus I built this ramp. The Bushnell has a high offset; however my plans are to replace with Burris Fastfire III.

Thursday, July 23, 2015

PROJECT OF THE MONTH SUBMISSION - JET LATHE PART

PREFACE

Its really Bobby and Donny Allison's fault. As a young engineer I worked for a WWII hero that flew Thunderbolts in Europe and was also the owner of Birmingham International Raceway, Tom Gloor. A fine man. Friday nights the seats were filled, 8000 people crowded to see NASCAR drivers fight it out with locals Friday Hassler, Donnie Anthony, Neil Bonnet, Red Farmer, Alton Jones and many others. Dad listened at the "The Y" café in Hueytown as Allison's planned Friday at BIR then Nashville Saturday and I was enamored. More on that.

Here is my entry:

 
 
Three parts which comprise the lead-shaft half nuts housing of my JET 13X40 GH lathe. So what is so special about these three parts? There is background here ending with:

Prior to my purchase of the PM 9X49 mill (no surprises here) I owned a JET 18 PF mill-drill. This mill had more moves than a Hawaii Hulu dancer even with 400 lbs of lead attached. So I called MSC (that was before I knew about Hobby-Machinist) and asked "milling tech" about a vise they had on sale. He recommenced the shown item a Gibraltar on sale 35% off, only $200. Wow. That is it now with gage block and 0.008 feeler gage at heel. Three days ago I asked "milling tech" to replace this vise with a higher quality. He said all he could do is replace it same with a reduced price. Gimme a break "why do I need 2 boat anchors?". I passed. They stonewalled and said "some of these have quality problems. Says I "the description did not say quality inhibited" you moron. Needed some constraint here.
So I decided to repair. Milled top slots flat and opened holes such that they would allow 1/2" clamp bolts and added a class I toggle clamp to support heel:

I remember Jimmy Carter espousing "trade agreements will reduce our costs tremendously" obviously like Billy beer. The Class I toggle clamp only reversed the rotation since the heel had been milled with reverse slope to compensate for the clockwise rotation. So disassemble and mill heel 90 degrees to face. Japanese products were once "haphazard" at best but now are well made. Once we Americans get tired of "unfinished" tooling, the entire scheme will change. To purchase 90% of all Chinese products yields work to be performed by the buyer with no consequence to the SELLER, a continent away. Foul, Jimmy Carter.
I haven't proven my point yet, have I?

A NEW BEGINNING
This entire chronology started at Pensacola Speedway in December of 2005. After a year of preparation, the #23 late model began practice sessions and since tires are limited (you can only buy 10) the shoes were old and practice times were 18 flat I knew we were competitive. This is one of the most prestigious late model races of the year, $25k to win and if you make the race, you have made money, well almost. Kyle Bush showed up with a 10 man crew and a hauler that had a hauler, a house and 3 extra cars.

My team was not quite as grandiose. A mopping bucket, 4 extra wheels, 2 lounge chairs, a tire changer and my wife. We did arrive in an enclosed trailer. (The #23 originally was previously driven by Gary Nix. He turned 20.0 sec around BIR in that car and he is still racing today.)  Practice laps with unproven car is carefully initiated; however, you can't be a hazard so with 5.23 rear quick change gears, you let off at 7000 rpm and then turned left slowly picking up the pace and then using little brakes to slow to corner.
The engine was rented from Keith Watts from Holly Pond, Al. Unlike my race engine, this engine was an SB2 block painted black to look like a 350 and made about 700 hp on the dyno @ 8000 using my legal 750 Holly carburetor. About 10 laps the fluids were up and coming into turn 1, let off at 8000 and simultaneously applied binders and the 23 uncharacteristically swapped ends and hit the Turn 1 wall .....wham, wham,  wham. Yep 3 times. An hour later Sue said "they're calling for qualifying, can we fix this thing that looks like a pretzel?" and held up the drive shaft. I said "look in the bucket dear."
Days later I discovered the Wilwood caliper on the left front was a RIGHT REAR caliper. The young dummy thought my old left front caliper should be replaced with a new one.  Well it had a few thousand laps on it and old is bad. Right.
 
 THE #23 REBUILD
The free time the succeeding months until Memorial Day of 2006 were spent improving 23. Any improvement would be better than the wall tap condition. Didn't make it. Contracted a disease called "farmers lung" the Monday after MD weekend. After my blood pressure dropped to 40/20 racing was not on the list and shop work is difficult while on a ventilator. By the latter part of 2007 I was one of the 10% that normally survive. Recovery was not a cakewalk and wiser learned physicians opted to perform a lung biopsy to ascertain medication effectiveness. The risk was low, only they forgot to tell the surgeon. He used the wrong Allen wrench and I, once again, was in HIS hands. Just "one of those things" they exclaimed. Wow fooled me. New tires won't help. Five years later I could walk. The #23 LM is covered in dust.
 
Then came the JET lathe. Rebuild or start with new equipment? Eventually I decided new for the simple reason "if new it has warranty" and in America we have rights. Yeah, I know. Me and Thomas Jefferson and the "new" syndrome. And really, how hard can it be?
 
After shipping from Tennessee it stayed on the loading dock in Birmingham for over a month, frustrated I hired Apel Machine to locate it and drop it at the shop Remlap, Alabama. Sometime during the 1880s there was a Baptist Church at Palmer, Al, Jefferson County. Some dispute occurred and brothers began un-churchlike attitudes or maybe needed an adjustment. One of the parties moved north along old Highway 75 just into Blount County and named the Church R-E-M-L-A-P Baptist Church. So the little town became Remlap with a US Post Office.
 
The Two Year Warranty
Finally my 13X40 got here, that was 4 years ago. Those were 2 difficult years. I had discovered a 5" bar chucked and turned full length would be 2 different diameters. I read, studied, researched and with the help of Tony Wells and Richard King found the headstock was not parallel to the ways. That was two years later and very close to the warranty expiration. After this period of limited response I was at the "charge mentality" and let rough end drag. Shoot Tonto, Kemo Sabe is right behind. Tony finally convinced me to "just fix it" after listening to my "but I have a warranty", they can't so that. Surprise, if the Flintstones don't think it is possible, then chuck it.
 
The JET Representative
Finally, some response from the US distributor. Man I was elated. We are talking about a Superbowl touchdown celebration here. Scheduling and planning happened quickly to my surprise.  Honestly, the rep had a long drive and arrived in a big turbocharged Dodge diesel pickup (JET nowhere on the doors) and the bed was filled with tools. He shows me his indicators (8) and I produce my 3 Shars specials with non-Noga holders. All the work we did is not worth describing. However, at the end of the day, the rep showed me how foolish my approach had been. You see, when you turn a bar that is a truncated cone you have not used a large enough "cheater" on the chuck wrench. The appropriate size is a 10" crescent wrench.   This guy was so sure of himself, it was like Patton headed to Rome.  So after his demonstration, I mentioned how late he was going to be getting back to Tennessee. So my 2 year warranty expired that night. Enlightening to say the least.
The 4 Jaw Chunk It Episode
Having some reservation, I erroneously decided a 4 jaw chuck was needed. (all it needed was to have the jaws reground. could have sent it to RayC.) One of the local machine shops here used Rohm chucks and some 20 yrs old. That was enough to convince, so out with the card and one is on the way. Top gear. Then I promulgated Richard King's "headstock to ways" alignment procedure, not easy.
   Well, it wasn't. So after 90 days of haggling, Rohm returned my investment. I discovered the chuck


jaw mis-grind after rechecking my "test-bar". That was in 2013.  I now own a Bison 4 haw independent; however, the head needs to be realigned and the jaws checked before that process is initiated. THEN THE LATHE HOUSING FAILED. That was in 2014.
 
 
 
 
 
 
 
 
 
 
                                                                                                                                                                          

Monday, April 22, 2013

Final Chapter on The Eliseo-W52

The rigid frame tests did not represent the innate accuracy of the barrel-receiver assembly. Some compliance is needed as shown elsewher and as mentioned here. The vibrational characteristics of the assembly are extremely complex and all most of us can do is conjecture. Real analysis is left to large budget organizations; however, my original assumption can neither be verified or debunked from the data presented. I have bungled into a shooter. Since the original testing post some months ago. Today after much consternation I am relieved to publish the rifle receiver-barrel is capable of more than 1/2 minute of angle at 100 yards; however, this statement is qualitative vs. quantitative. I fired 50 rounds today, which is good for me, temperature 70^F, wind varies at 7-10 mph, relative humidity 45%, sunny with few clouds. All at 100 yds. The time was from 1:30 to 2:30 PM. Now the wind is calm and I should be shooting. Oh well.
Here is my last target.


Relatively typical of the last 30 rounds, after I got settled down. Wolf ET and a few UM22 off sand bags and prone. 10 rounds. The 10 at 11:00 was yours truly. I was holding off to make wind corrections and holding low to compensate for excessive slope in the scope ramp. 0.015" lower  would make my job easier. The were called shots. Specific conditions of compensation will not add to the narrative, so I will avoid that issue in the quest of conciseness. A good shooter could get less than 1/2" at 100. The distinct 9:00 and 3:00 are just that. The vertical dispersion is a result of guessing at my "low" hold and sometimes not getting it corect.

 The original scope ramp was too low and the addition of the medium to high Burris rings did not solve the problem.


Now ammunition is not easy to find and I wasted half a brick before I realized I was "cheeking" the stock adjustment screw  was full down. Also as I wished to change scopes, refinements in the windage and elevation adjustment was necessary, so I just constructed a new ramp with those features. Impossible to see in the photo are capstan nuts that move a sliding bar at the rear ring mount. The construction was not easy since there seems to be holes everywher to avoid. Loosen the Burris rings and adjust the capstan appropriately. Shims and slope accomodate the vertical about 0.020" between front and back rings. Bore sighting took less than 10 min to acheive and the result was within 4" of center. That is when I discovered I did not have enough "down" movement. I am not happy with the Burris scope. The clicks are too coarse and the resolution inadequate for an old man. Futhermore, the higher powers are worthless. The old 10X Weaver as seen in other photos lacked resolution also. Thus replacement did not solve the problem.  What I need is a good fixed power 12X with 1" tubes.  Maybe it is just my "tired" eyes.

Were I to contemplate this project again the stock would consist of Eliseo front and back; however the stock-receiver portion would be a U shape. Also I have a Remington action that can be used and that will be my next endeavor.